Job Scope

Instrumentation Works:

  • Support Fabrication and Scaffolding Works
  • Support for cable duct tie-in at F03 Pipe Rack
  • Support for FCS-3 Cabinet
  • Cabling from F03 LCR to F03 MCC CTB & Termination at CTB
  • Support for cable duct tie-in at ITY.

Electrical Works:

  • Support Fabrication and Scaffolding Works
  • Laying of MV Cable on existing cable tray (MV SS to splicing point)
  • Support and Installation of MV cable tray from existing to ITY.
  • Installation of MCC-ITY
  • Modify existing DB for additional 400A MCCB
  • Cabling from existing DB to MCC-ITY
  • Installation of new Control Cable
  • Installation of New Panels
  • Cabling, Termination and Testing