105 MW COAL FIRED POWER PLANT PROJECT
Client : ATS CONSTRUCTION INTL. INC. (JAPAN GAS CORP. PHILIPPINES)
Location : SARANGANI, GENSAN
Duration : SEPTEMBER-DECEMBER 2018
Types of Works: Electrical & Instrumentation Works
Job Scope
Instrumentation Works:
- Support Fabrication and Scaffolding Works
- Support for cable duct tie-in at F03 Pipe Rack
- Support for FCS-3 Cabinet
- Cabling from F03 LCR to F03 MCC CTB & Termination at CTB
- Support for cable duct tie-in at ITY.
Electrical Works:
- Support Fabrication and Scaffolding Works
- Laying of MV Cable on existing cable tray (MV SS to splicing point)
- Support and Installation of MV cable tray from existing to ITY.
- Installation of MCC-ITY
- Modify existing DB for additional 400A MCCB
- Cabling from existing DB to MCC-ITY
- Installation of new Control Cable
- Installation of New Panels
- Cabling, Termination and Testing