230 KV TRANSMISSION LINE AND SUBSTATION BACKBONE PROJECT
Client : MERALCO INDUSTRIAL ENGINEERING SERVICES CORP. (MIESCOR)
Location : BUNAWAN, DAVAO CITY
Duration : FEBRUARY 2018 – FEBRUARY 2021
Types of Work: Electrical & Civil Works
Job Scope
I. Site Clearing, Grubbing and Stripping
Supply of labor , tools, equipment, consumables, PPEs, technical expertise and supervision in the execution of the following works: 1. Clearing, Grubbing and Stripping ; 2.Hauling and Disposal of excess materials
II.Equipment Foundations
Supply of labor, tools, equipment, consumables, materials, PPEs, technical expertise and supervision,including layout and staking, excavation, backfill and compaction, fabrication and installation of rebars, formworks and scaffoldings, concreting, setting of anchor bolt, grouting and surface retouching to attain smooth finish (for pedestal and cable trench), in the execution of the following works: 1. Construction of 230 KV Gantry and Equipment Foundations; 2. Construction of 138 KV Equipment Foundations.
III. Cable Trench and Cable Trensh Crossing Roadways
Supply of labor, tools, equipment, consumables, materials, PPEs, technical expertise and supervision, including layout and staking, excavation, backfill and compaction, fabrication and installation of rebars, formworks and scaffoldings, concreting, setting of anchor bolt, grouting and surface retouching to attain smooth finish (for pedestal and cable trench), in the execution of Civil Works for Cable Trench and Cable Trench Crossing Roadways.
IV. Roadways and Parking
Supply of labor, tools, equipment, consumables, materials, PPEs, technical expertise and supervision, including layout and staking, excavation, backfill and compaction, fabrication and installation of rebars, formworks and scaffoldings, concreting, setting of anchor bolt, grouting and surface retouching to attain smooth finish (for pedestal and cable trench), in the execution of the following works: 1. 6.0m wide service roadway; 2. 5.5m wide service roadway; 3. 4.0m wide service roadway; 4. 3.0m wide service roadway; 5. Concrete parking; 6. Concrete Curb and Gutter
- Furnishing, supplying, delivering, installing, laying, termination and testing.
- Cable trays and accessories, Hot Dipped galvanized for 230KV Switchyard, Control Building, BCU Building, and Auxiliary Building.
- Furnishing of labor, equipment, tools and materials for the hauling (To be taken from NGCP warehouse/Stockyard located within the substation), Erection/Installation and/or Laying (Including steel support structures) of the Power transformer and accessories, Circuit breaker and accessories, Instrument transformers and Busworks Grounding and Power Cables.