BAGO BINARY GEOTHERMAL POWER PLANT
Client : JGC PHILIPPINES, INC.
Location : BAGO CITY, NEGROS OCCIDENTAL
Duration : NOVEMBER 2023 – AUGUST 2024
Types of Work:
Electrical Works
-
- Installation of lighting fixture
- Installation of lighting junction box
- Installation of perforated tray for lighting
- Cabling works of lightings
- Excavation, installation of flexible conduit, cable pulling, grounding & backfilling on existing perimeter lighting pole foundation.
- Bonding of structures & equipment
- Cadwelding works of branch grounding cables
- Covering of ladder & perforated tray for power & control.
- Installation of Cable Route Marker
- Punchlist works
Instrumentation Works
-
- Installation of Name Plates
- Punchlist works
Site Instruction
-
- Dismantling & Erection of Existing Lighting Pole including Cleaning, Painting, Installation of Lighting Fixtures.
- Installation of Additional Photocells including cabling, perforated tray & termination works.
- Grounding Works of Equipment/Structure Bonding from Grid to Equipment including Excavation, Cabling, Cadwelding, Installation of grounding eye & Termination works.
- Relocation of CCTV Units from Air Compressor to Transformer Area & Econ Building including installation of perforated tray, cabling & termination works.
- Fabrication & Installation of maintenance steel step flatform for SUT
- Assist on Hot Commissioning Works
- Fabrication & Installation of cable tray elbow cover
- Painting of supports at Chemical Dosing & Acid Dosing Area
- Installation of perforated tray, secondary cabling works
- Installation of Instruments
- Termination works