MAHANAGDONG GEOTHERMAL BRINE OPTIMIZATION POWER PLANT
Client : JGC PHILIPPINES, INC
Location : MAHANAGDONG, ORMOC CITY, LEYTE
Duration : OCTOBER 2023
Types of Work:
Electrical
- Installation of cable ladder tray and supports
- Installation of Perforated tray for branch cable and supports
- Installation of lighting system
- Installation of earthing and air terminal
- Installation of Lighting Panel
- Installation of LCS
- Installation of CCTV System
- Cable Pulling and Termination
- MV/HV Cable Termination
- Motor Solo run
- MCC and Switchgear Termination and Testing
- Transformer accessories Installation and testing
- UPS Testing
- Commissioning assistance
Instrumentation
- Installation of cable ladder tray and supports
- Installation of Perforated tray for branch cable and supports
- Installation of Instrument and supports
- Junction box and Panel Installation
- Cable Pulling and Termination
- Installation of tubing
- Calibration of Instrument
- Testing (such as Loop Check and Leak Testing)
- Commissioning assistance